This OCR scan may contain automatically generated text as generated using Apache Tika and Tesseract. It may not be correct. No effort has been made to correct any of these scans (so far). These OCR scans are also used in the site's Search feature. Please review the Search Policy for details about the site features. The OCR scan is provided here for reference purposes. It provides searchable text when the underlying document might not. But the scan process may not always work perfectly.
COMMONWEALTH OF VIRGINIA DEPARTMENT OF MINES, MINERALS AND ENERGY
DIVISION OF MINED LAND RECLAMATION P.O. DRAWER 900, BIG STONE GAP, VA 24219
TELEPHONE: (276) 523-8198
ABANDONED MINE LAND INSPECTION
DMLR-AML-130S Printed: 02/05/19 5/06 Page 1 of 1
HNM0008488
PROJECT NAME PROJECT NO. GRANT YEAR REPORT NUMBER
Golden Pond Gob Removal 18302 2018 HNM0008488
CONTRACT INFORMATION
CONTRACT NUMBER EXPIRATION DATE PERCENT OF CONTRACT COMPLETED
C196013 03/31/21 0
CONTRACTOR NAME ENGINEER NAME
Russell County Reclamation, LLC SCOTTY COX
SITE CONTACT PERSON: Kevin Large
INSPECTION DATE ARRIVAL DEPARTURE GROUND CONDITION
01/14/19 10:00 AM 11:30 AM FROZEN
INSPECTION BY ATTACHMENTS
MCDONALD-TAYLOR, H.
COMMENTS
The following equipment was checked by DM Inspector Vernon Johnson, Jr on 12-26-18 and found to be in safe operating condition: (1) Caterpillar excavator with flip screen bucket, (1) Caterpillar 980 G loader, (1) Caterpillar 938 H Loader, (1) John Deere65 dozer, (1) Volvo EC250 excavator with long boom, (2) Volvo A40G off-road trucks and (1) Volvo A30G off- road truck.
On 1-14-19, the site was reviewed by DMLR engineer Pat Leady and water quality specialist Andrew Hensley. The primary purpose of the visit was to review the area between Golden Pond and Pond 2 to determine the best plan for conveying water to Pond 2.
The company continues to screen refuse in anticipation of the start of the project; however, fines removal has not yet commenced. Application 1010465 has received technical approval and is awaiting approval of the cost bond. Approval of application 1010465 will allow the company to begin pumping water from Golden Pond in to the permitted ponds.
COMMONWEALTH OF VIRGINIA HNMo0008488
DEPARTMENT OF MINES, MINERALS AND ENERGY Dh DIVISION OF MINED LAND RECLAMATION
P.O. DRAWER 900, BIG STONE GAP, VA 24219 Virginia Depay TELEPHONE: (276) 523-8198
Mines Minerals and Energy ABANDONED MINE LAND INSPECTION
PROJECT NAME, PROJECT NO. GRANT YEAR | REPORT NUMBER
Golden Pond Gob Removal 48302 2018 HNM0008488
CONTRACT INFORMATION
CONTRACT NUMBER EXPIRATION DATE, PERCENT OF CONTRACT COMPLETED
C196013 03/31/21 0 CONTRACTOR NAME ENGINEER NAME,
Russell County Reclamation, LLC SCOTTY COX
‘SITE CONTACT PERSON: Kevin Large
INSPECTION DATE, ARRIVAL DEPARTURE. GROUND CONDITION 01/14/19 10:00 AM 14:30 AM FROZEN INSPECTION BY ATTACHMENTS
MCDONALD-TAYLOR, H.
COMMENTS: ]
The following equipment was checked by DM Inspector Vernon Johnson, Jr on 12-26-18 and found to be in safe operating condition: (1) Caterpillar excavator with flip screen bucket, (1) Caterpillar 980 G loader, (1) Caterpillar 938 H Loader, (1) John Deere65 dozer, (1) Volvo EC250 excavator with long boom, (2) Volvo A40G off-road trucks and (1) Volvo A30G off- road truck.
On 1-14-19, the site was reviewed by DMLR engineer Pat Leady and water quality specialist Andrew Hensley. The primary purpose of the visit was to review the area between Golden Pond and Pond 2 to determine the best plan for ‘conveying water to Pond 2.
The company continues to screen refuse in anticipation of the start of the project; however, fines removal has not yet ‘commenced. Application 1010465 has received technical approval and is awaiting approval of the cost bond. Approval of application 1010465 will allow the company to begin pumping water from Golden Pond in to the permitted ponds.
DMLR-AML-130S Printed: 02/05/19 5/06 Page 1 of 1